©2017 All Rights Reserved.

Powered by www.300.cn weifang

鲁ICP备15009042号



Environmental protection project

Key words�
 
PROJECT
Shandong Xuridong Machinery Co.Ltd
 
PROJECT ONE
 
XINXING Urban wastewater treatment plant 
01. Capacity: 24000 m3/day 
02. Influent: domestic and industrial wastewater 
03. Effluent: to the river, with cod of 60mg/l, and bod5 of 20mg/l. and ss of 20 mg/l.
04: Main technical flow chart
 
 
 
05. Working site pictures